Eclipse 2017 – Where Will You Be?

How will you be celebrating the Great Eclipse of 2017?  Rather then risk the expected/hoped for hoards of people heading north I am staying in Boise.  We are approximately 50 miles off the edge of totality but hey that is close enough for me. I will be heading up to join Paula at CM’s office on higher ground for the viewing.  Gonna throw out the lawn chair, set up a camera, que up Dark Side of the Moon at the predetermined time to sync with peak totality and chill.

Makes One Wonder

Image result for top secret Read an article today regarding Hillary and her aides possibly losing their security clearances.  Why is any former politician and their staff entitled to access secret and sensitive documents once they are no longer in office?  Why would they need this info?  Seems ripe for abuse.  Could be one reason they can rake in big bucks when joining the civilian working world.  Require them to use the Freedom of Information process like any other citizen.  This is the kind of stuff that makes me scratch my head and explains some of the non-sense of how are country is running at the federal level.

Projects – Summer of 2017 • Part 2

Back around the same time the idea of painting the house was percolating  in my head or, maybe even before, Paula and I decided it was time to get serious about enlarging our north “side” patio.  This is the oft used but smaller of our two patios.  A contractor, recommended by Paula’s retired boss at CM, was selected.  After a few email exchanges and modifications to the original plan the contract was signed.  It was a simple small job consisting of busting out a 2′ border on two sides and replacing it with a 6′ border (see diagram – gray sections get removed and gray and blue are new additions).

Our rainy spring complicated the scheduling of the job but eventually there was a break and the work commenced on Monday March 13.  Was one little hitch though.  The concrete truck arrived and the two man (one being the owner) crew were not ready to pour mud.  It was at this point to me it was very obvious the guys went into rush mode.  Doesn’t take an MBA to realize that the meter is ticking while the truck driver is sitting twiddling his fingers.   They even had two loads of concrete poured when I reminded them they had not yet installed the rebar to tie this new into the old!!  It is during this frenetic pace that I have a sneaking suspicion that they nudged a fence post with their Bobcat.  Long story short the workmanship wasn’t acceptable and the contractor tore it all out and re-poured it.  He later admitted he was not proud of the original work.

Version 1.0 – from the top it looks great but ………
… looking at the edge this is what you saw. Not good.

 

Version 2.0 – much better.

 

We are enjoying the extra elbow room.  Was one of those things you wished you had done years earlier.

The new patio pretty much “cemented ” the painting project now on the schedule for April.  It also was the catalyst for some cleaning up of the back yard, mending a rickety gate along with replacing a post and rail plus reseeding the area adjacent to the new patio.  Of course I had all these tasks scheduled, choreographed, planned and dialed up.  But as we all know “the best laid plans of mice and men ….”

Most of the news about the Neu's in Boise.